Henning


In Henning, the Demonstration project includes:

  • Temporary striping and delineators between 2nd St and Front St to show proposed width adjustments to the driving lanes and parking lane
  • Mid-block bump out for proposed improvements to pedestrian crossing
  • Pedestrian bump out at each end of town at Marshall Ave/4th St and Minnesota St

These features demonstrate potential improvements that are a part of the reconstruction of Highway 108 in Henning.

For more information visit http://www.dot.state.mn.us/d4/projects/henning/

Project Photos