Henning
In Henning, the Demonstration project includes:
- Temporary striping and delineators between 2nd St and Front St to show proposed width adjustments to the driving lanes and parking lane
- Mid-block bump out for proposed improvements to pedestrian crossing
- Pedestrian bump out at each end of town at Marshall Ave/4th St and Minnesota St
These features demonstrate potential improvements that are a part of the reconstruction of Highway 108 in Henning.
For more information visit http://www.dot.state.mn.us/d4/projects/henning/
Project Photos
Previous
Next